NEW Mini pile-driving mashine  "Svayak-MKU-900" 

It is intended for production of the bases with use of reinforced concrete piles.

Mini pile-driving mashine  "Svayak-MKU-900" is capable to move independently on off road terrain, to overcome various obstacles, at the same time without leading to change of a land relief of terrain. Perfectly copes with a task in the conditions of dense building and viscous soils. Easily moves from an object to an object, thanks to the dimensions which aren't demanding special permissions. Has the reliable and economic engine.

Mini pile-driving mashine "Svayak-MKU-900" can be operated at a temperature from - 30 to +40 С0 and in any weather conditions.

Productivity of Mini pile-driving mashine is up to 45 piles for a 8-hour shift. Possibility of work with piles up to 6 meters long, with a section up to 200 mm. The design of an arrow allows to clog piles under various discharge angle.

For work at night and places with bad lighting, installation is equipped with LED illumination of a working zone.

The power framework of installation is made of high-strength steel and protected by an anticorrosion covering that provides durability and reliability of a design.

 "Svayak-MKU-900" by means of powerful  the hydraulic hammer is capable to immerse piles in all types of soils, including  chilled.

 By means of a winch with a loading capacity up to 4000 kg., can independently unload, move and establish piles.

The control system of Mini pile driver is simple in work, is easy in development, is intuitively clear. For work with Mini pile-driving mashine it is enough of everything 2 persons

Made in Russia.

Base benefits on steel concrete piles

Steel concrete pileMonolithic plateContinuous footingScrew pileBored piles
The foundation  is built in 1 dayThe foundation is built in 5-7 daysThe foundation is built in 5-7 daysThe foundation is built in 1 dayThe foundation is built in 5-7 days
It is possible to build in day of construction of the baseIt is possible to build in 20 days on the end of fillingIt is possible to build in 20 days on the end of fillingThe base demands shrinkage of soil because of its loosening at screwing up of pilesIt is possible to build in 20 days on the end of filling
Maximum load on one pile to 60000kg (depending on soil type)Maximum load on the basis 3000kg on m2 at a thickness of plate of 300 mmMaximum load on the basis of 17000 kg on m2 with a depth of base of 1,6 mMaximum load on one pile no more than 3000kg. Drawing an anticorrosive covering is obligatory.Maximum load on one pile to 20000 kg with a length of pile up to 1,6 m
The term of the guaranteed operation more than 100 yearsThe term of the guaranteed operation more than 100 yearsThe term of the guaranteed operation more than 100 yearsThe term of the guaranteed operation — no more than 30 yearsThe term of the guaranteed operation more than 100 years
Is suitable for any types of soil and a land reliefIt is impossible to build on sites with a bias (the combination with piles is required)It is impossible to build on sites with a bias (the combination with piles is required)Limited scope of the baseIt is a lot of hidden works, it is difficult to check quality of the used concrete
Is suitable for all types of construction of individual housesThere is no possibility of construction of the cellarNeed of carrying out extra works on a waterproofingThe term of the guaranteed operation — no more than 30 years
The cost of construction is about $1900 for the base of 8x8 mThe cost of construction is about $5000 for the base of 8x8 mThe cost of construction is about $3000 for the base of 8x8 mThe cost of construction is about $1500 for the base of 8x8 mThe cost of construction is about $2900 for the base of 8x8 m

 

Look in news in Instagram

Ltd.
"Russian Construction Machinery"

OGRN
1163525103939
INN/KPP
3528265427/352801001
Address
162603, Vologda Region, Cherepovets, st. Ledneva, Building 2
Phone
+7(8202) 28-90-69 (tel/fax), +7(953) 523-35-35 (sales department),+7(900)500-63-01(technical support)
E-mail
pcm35@mail.ru